Skip to main content

GNWT-INF (Sahtu) - S12L3-009

The GNWT - DOT plans on replacing the existing Four Mile Creek Bridge with a new structure 20 metres downstream. The existing structure has been noted as damaged and unsafe. DOT will supply plans for the dismantling and reclamation of the existing bridge at a later date.

The associated Land Use Permit is S12E-009​.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
7. Monitoring Programs
Other Monitoring Program
Document Received/Sent Uploaded
S12L3-009 - DOT - Correspondence - Four Mile Creek Water Crossing Issue - May 17_16.pdf (2.87 MB)
S12L3-009 - DOT - Four Mile Creek Repair Report - May 16_16.pdf (12.55 MB)