Skip to main content

GNWT-INF (Sahtu) - S12L3-009

The GNWT - DOT plans on replacing the existing Four Mile Creek Bridge with a new structure 20 metres downstream. The existing structure has been noted as damaged and unsafe. DOT will supply plans for the dismantling and reclamation of the existing bridge at a later date.

The associated Land Use Permit is S12E-009​.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
S12L3-009 - Inspection Report - Feb 21_17.pdf (463.82 KB)
S12L3-009 - Inspection Report - Aug 21_15.pdf (2.63 MB)
S12L3-009 - stop work order - Feb 04_14.pdf (220.11 KB)
S12L3-009 - site inspection - Feb 04_14.pdf (586.69 KB)