GNWT-INF (Sahtu) - S12E-008
Status:
Closed
Authorization:
Land Use Permit
Activity:
Road Public
Start:
January 14, 2013
Expiry:
January 12, 2018
Staff:
Bonnie Bergsma
The GNWT - DOT plans to replace the existing Prohibition Creek Bridge. Winter 2012-2013 development includes site preperation, embankment construction, river protection construction and earth works. The bridge structure will be completed during winter 2014. Additional information regarding bridge construction will be supplied closer to the time of construction.
The associated Water Licence is S12L8-008
The associated Water Licence is S12L8-008
Displaying 1 - 5 of 5
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S12E-008 - Prohibition Creek Bridge As-Built Drawing - Apr 9_19 -.pdf (867.58 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S12E-008 - Inspection Report - Feb 21_17.pdf (1.19 MB) | ||
S12E-008 - inspection report - Jan 22_14.pdf (1.6 MB) | ||
S12E-008 - Inspection Report - Dec 06_13.pdf (283.94 KB) | ||
S12E-008 - Inspection Report - Aug 08_13.pdf (407.57 KB) |