MGM Energy - S04L1-011
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
December 9, 2004
Expiry:
December 8, 2009
Staff:
NA
Associated Land Use Permit is S04A-010. Exploratory drilling of two wells in the Lac Maunoir area approximately 65km north east of Colville Lake.
Documents
Displaying 1 - 60 of 60
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 - Water Licence - Dec 10_04.pdf (764.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011- MGM Energy - Water Licence - Sept 26_18.pdf (386.43 KB) | ||
S04L1-011 - MGM Energy - Issuance Letter - Sept 26_18.pdf (43.9 KB) | ||
S04L1-011 - MGM Assignments ReviewCommentTable - Aug 30_18.pdf (223.38 KB) | ||
S04L1-011 - Application to Assign - May 30_18.PDF (66.88 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 - MGM Energy - Assignment - Staff Report Sep 26_18.pdf (265.99 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 - Assignment Application - Apache to MGM - May 30_18.pdf (41.98 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 AANDC site inspection report - Sept 25_13.pdf (330.05 KB) | ||
S04L1-011 - Aboriginal Affairs and Northern Development Canada Response to 2011 Summer Site Inspection Reports - May 30_12.pdf (74.43 KB) | ||
S04L1-011 - 2011 Summer Site Inspection Report - Maunoir A-67 Lease - Nov 11_11.pdf (1.98 MB) | ||
S04L1-011 - 2011 Summer Inspection Report for A-67 - Nov 11_11.pdf (1.98 MB) | ||
S04L1-011 - 2011 Summer Inspection Report - Nov 11_11.pdf (4.68 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 - Preliminary Screening - Nov 23_04.pdf (534.93 KB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
S04L1-011 - MGM-Apache 2012 Sahtu Reclamation Plan - June 28_12.pdf (4.56 MB) |