Skip to main content

Imperial Oil Resources Ltd. - S03L1-001

To withdraw 3,500,000 m3 of water per year from the Mackenzie River for process cooling and injection into the oil reservoir.  
Uploaded On or After
Uploaded On or Before
Displaying 1 - 66 of 66
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S03L1-001 - 2014 Annual Water Use Report - Mar 31_15.pdf (2.04 MB)
S03L1-001 - Mackenzie River Break Up Report 2014 - Oct 31_14.pdf (24.38 MB)
S03L1-001 - Annual Water Use Report 2013 - Mar 31_14.pdf (965.46 KB)
S03L1-001 - Responses from Imperial to Additional IRs - 2013 Breakup Report - Mar 11_14.pdf (733.98 KB)
S03L1-001 - Responses from Imperial Oil to IRs - 2012 Annual Report - Feb 15_14.pdf (68.74 KB)
S03L1-001 - Additional Information Requests from SLWB and NEB - 2013 Breakup Report - Feb 10_14.pdf (124.42 KB)
S03L1-001 - Response from Imperial Oil to SLWB and NEB - 2013 Breakup Report - Jan 20_14.pdf (1.06 MB)
S03L1-001 - Annual Breakup Report 2013 - Information Request from SLWB and NEB - Jan 02_14.pdf (170.61 KB)
S03L1-001 - Mackenzie River Breakup Report 2013 - Oct 31_13.pdf (23.08 MB)
S03L1-001 - Annual Water Use Report 2012 - Mar 28_13.pdf (547.15 KB)
S03L1-001 - Response from IORL to SLWB and NEB - 2012 Breakup Report - Mar 25_13.pdf (141.96 KB)
S03L1-001 - Mackenzie River Breakup Report 2012 - Oct 31_12.pdf (26.43 MB)
S03L1-001 - Annual Water Use Report 2011 - Mar 30_12.pdf (241.56 KB)
S03L1-001 - Mackenzie River Breakup Report 2011 - Nov 04_11.pdf (5.41 MB)
S03L1-001 - Annual Water Use Report 2010 - Apr 4_11.pdf (2 MB)
S03L1-001 - Mackenzie River Breakup Report 2010 - Nov 05_10.pdf (4.2 MB)
S03L1-001 - Annual Water Use Report 2009 - Apr 6_10.pdf (2.45 MB)
S03L1-001 - Mackenzie River Breakup Report 2009 - Nov 02_09.pdf (1.92 MB)
S03L1-001 - Annual Water Use Report 2008 - Mar 31_09.pdf (2.33 MB)
S03L1-001 - Mackenzie River Breakup Report 2008 - Nov 17_08.pdf (3.04 MB)
S03L1-001 - Annual Water Use Report 2007 - Mar 31_08.pdf (1.19 MB)
S03L1-001 - Mackenzie River Breakup Report 2007 - Oct 30_07.pdf (3.23 MB)
S03L1-001 - Annual Water Use Report 2006 - May 27_07.pdf (5.43 MB)
S03L1-001 - Mackenzie River Breakup Report 2006 - Nov 01_06.pdf (7.49 MB)
S03L1-001 - Annual Water Use Report 2005 - Mar 23_06.pdf (2.27 MB)
S03L1-001 - Mackenzie River Breakup Report 2005 - Oct 17_05.pdf (8.68 MB)
S03L1-001 - Annual Water Use Report 2004 - May 31_05.pdf (1.11 MB)
S03L1-001 - Mackenzie River Breakup Report 2004 - Oct 29_04.pdf (9.79 MB)
Designs and As-Builts
Document Received/Sent Uploaded
S03L1-001 As-Built Drawings Soil Treatment Facility (Biocell) Modification - Feb 16_15.pdf (792.02 KB)
S03L1-001 - As Builts - New Containment Area - Sept_14.pdf (1.15 MB)
Inspection Reports
Document Received/Sent Uploaded
S03L1-001 - Inspection Report - Norman Wells NT - AANDC - Mar 4_15.pdf (1.06 MB)
S03L1-001 - NEB Inspections - Jun 23_14.pdf (846.5 KB)
S03L1-001 - Inspection Report - Jun 26_13.pdf (401.64 KB)
S03L1-001 - Inspection of Water Licence - Jul 27_05.pdf (574.3 KB)
S03L1-001 - Inspection Report - Mar 22_05.pdf (910.88 KB)
S03L1-001 - Inspection Report - May 06_05.pdf (900.03 KB)
S03L1-001 - Inspection Report May 10_06.pdf (390.96 KB)
S03L1-001 - Inspection Report Oct 16_07.pdf (207.75 KB)
S03L1-001 - Inspection Report Water Use - Sep 07_11.pdf (504.2 KB)
S03L1-001 - Inspection Report Water Use Feb 03_11.pdf (837.2 KB)
S03L1-001 - Inspection Report Water Use Feb 17_10.pdf (317.88 KB)
Operations and Notifications
Document Received/Sent Uploaded
S03L1-001 - Goose Island to Island 3 in-river work SLWB approval - Jan 9_14.pdf (355.09 KB)
S03L1-001-Letter - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (307.82 KB)
S03L1-001- Report - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (2.36 MB)
S03L1-001 - Lateral 1 and 3 Replacement Final As-built Drawings - July 31_14.pdf (429.1 KB)
S03L1-001 - Updated Upper Bosworth Creek Bridge Restoration - Jan 23_14.pdf (1.55 MB)
S03L1-001 - Lateral 1 and 3 Injection Supply Line Replacement Project - Nov 15_13.pdf (457.43 KB)
S03L1-001 - Upper Bosworth Creek Bridge Restoration - Mar 25_13.pdf (4.17 MB)
S03L1-001 - Exposed Electrical Cable - Bear Island to Island 6 - Mar 21_13.pdf (2.32 MB)
Progress Reports
Document Received/Sent Uploaded
S03L1-001 - Goose Island O-18X Flowline Release 2014 Groundwater Report - Oct 22_14.pdf (29.65 MB)
S03L1-001 - Goose Island O-18X Flowline Release - Update and Phase 2 EA Results - Oct 31_13.pdf (8.22 MB)
S03L1-001 - Goose Island - O-18x Flowline Release Site Update - May 31_13.pdf (14.22 MB)
S03L1-001 - Goose Island Q-06X - Closure Report - Apr 30_13.pdf (15.87 MB)
S03L1-001 - NEB Response to Remedial Action Plan for Q-06X - Apr 25_13.pdf (130.85 KB)
S03L1-001 - Goose Island Q-06X Remedial Action Plan - Feb 07_13.pdf (14.44 MB)
S03L1-001 - O-18X Remedial Action Plan Addendum - Nov 30_12.pdf (6.15 MB)
S03L1-001 - Q-06 Flowline Release Initial Cleanup Plan - Nov 12_12.pdf (6.73 MB)
S03L1-001 - Spill Q-06 Initial Action Plan - Oct 17_12.pdf (1.74 MB)
S03L1-001 - IOR Response to SLWB 0-18x Remedial Action Plan - Jun-28_12.pdf (67.07 KB)
S03L1-001 - SLWB Response to O-18X Remedial Action Plan - May 23_12.pdf (83.24 KB)
S03L1-001 - Remedial Action Plan - Goose Island O-18X Flowline Release - Dec 16_11.pdf (647.89 KB)
S03L1-001 - E-33-1x Flowline Release Remediation Report - Apr 18_12.pdf (1.38 MB)
S03L1-001 - Remedial Action Plan - Bear Island M-43X- NT,NU Spill 2011-094 - Oct 19_11.pdf (600.57 KB)
SNP Program
Document Received/Sent Uploaded
S03L1-001 - Staff Report 9 - Amendment to IORL SNP - May 23_07.pdf (259.88 KB)
S03L1-001 - Staff Report 8 - Amendment to the Terms and Conditions Regarding Phenol Concentrations - May 04_06.pdf (2.68 MB)
SNP Reports
Document Received/Sent Uploaded
S03L1-001 - Staff Report 11 - Acute Lethality Testing Failure Nov 2,09 Backwash Pond - Dec 24_09.pdf (263.08 KB)