Skip to main content

Imperial Oil Resources Ltd. - S03L1-001

To withdraw 3,500,000 m3 of water per year from the Mackenzie River for process cooling and injection into the oil reservoir.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
SNP Reports
Document Received/Sent Uploaded
S03L1-001 - Staff Report 11 - Acute Lethality Testing Failure Nov 2,09 Backwash Pond - Dec 24_09.pdf (263.08 KB)