Skip to main content

Imperial Oil Resources Ltd. - S03L1-001

To withdraw 3,500,000 m3 of water per year from the Mackenzie River for process cooling and injection into the oil reservoir.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
S03L1-001 - Goose Island to Island 3 in-river work SLWB approval - Jan 9_14.pdf (355.09 KB)
S03L1-001-Letter - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (307.82 KB)
S03L1-001- Report - Imperial Oil - Goose Island to Island 3 Cover Work - Nov 24_14.pdf (2.36 MB)
S03L1-001 - Lateral 1 and 3 Replacement Final As-built Drawings - July 31_14.pdf (429.1 KB)
S03L1-001 - Updated Upper Bosworth Creek Bridge Restoration - Jan 23_14.pdf (1.55 MB)
S03L1-001 - Lateral 1 and 3 Injection Supply Line Replacement Project - Nov 15_13.pdf (457.43 KB)
S03L1-001 - Upper Bosworth Creek Bridge Restoration - Mar 25_13.pdf (4.17 MB)
S03L1-001 - Exposed Electrical Cable - Bear Island to Island 6 - Mar 21_13.pdf (2.32 MB)