Skip to main content

Imperial Oil Resources Ltd. - S03L1-001

To withdraw 3,500,000 m3 of water per year from the Mackenzie River for process cooling and injection into the oil reservoir.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
7. Monitoring Programs
AEMP - Program
Document Received/Sent Uploaded
S03L1-001 - AEMP Final Report - Sept 1_07.pdf (5.66 MB)
S03L1-001 - Progress Report for AEMP Preliminary Results from Phase 1 and 2 - Summary for SLWB - May 02_05.pdf (563.32 KB)
S03L1-001 - 2002 Fish Survey- AEMP - Sept 24_03.pdf (2.55 MB)
S03L1-001 - Staff Report 10 - Aquatic Effects Monitoring Plan - Apr 14_08.pdf (5.08 MB)
S03L1-001 - AEMP Plain Language Document - Mar 01_08.pdf (4.47 MB)