Skip to main content

GNWT-INF - MV2024E0003

​The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within thepermit area along the Yellowknife Highway (NWT No.3) between kilometre 200 and kilometre 338.8 (end of Highway #3) and along the Ingraham Trail (NWT No.4) between kilometre 0 (lntersection with the Yellowknife Highway at km 337.3) and km 69.2 (Tibbitt Lake - the end of the Highway) Corridor and includes the Community Access Roads for Behchoko (Rae) and Dettah and other minor roads along the Yellowknife Highway -Ingraham Trail Corridor.


Previously Permitted under MV2017X0008.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 23 of 23
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
GNWT – INF - HWY 3 and 4 – Administrative Update - Jun26_24.pdf (643.22 KB)
GNWT – INF – HWY 3 and 4 – Issuance - Type A Land Use Permit - Mar19_24.pdf (979.42 KB)
External Authorizations
Document Received/Sent Uploaded
GNWT - INF - Quarry Permit -2400085T - May16_23.pdf (500.56 KB)
GNWT - INF - Quarry Permit Application Issuance from GNWT - May10_24.pdf (53.48 KB)
GNWT - INF - Quarry Permit from GNWT - May13_24.pdf (61.79 KB)
Modifications
Document Received/Sent Uploaded
GNWT-INF - HWY 3 nd 4 - Administrative Error - Condition 62 - Maximum Fuel on Site - June6_24.pdf (163.42 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT-INF - HWY 3 and 4 - Waste Management Plan - Feb 1_24.pdf (311.24 KB)
GNWT-INF - HWY 3 and 4 - Spill Contingency Plan - Feb 1_24.pdf (707.76 KB)
GNWT-INF - HWY 3 and 4 - Engagement Plan - Feb 1_24.pdf (252.35 KB)
GNWT-INF - HWY 3 and 4 - Engagement Log - Feb 1_24.pdf (1.44 MB)
GNWT-INF - HWY 3 and 4 - Solid Waste Acceptance Letter - Feb 1_24.pdf (427.17 KB)
GNWT - INF - HWY 3 and 4 - Board Staff Draft Conditions - Feb1_24.pdf (374.08 KB)
GNWT - INF - HWY 3 and 4 - Application - Feb1_24.pdf (31.51 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
GNWT – INF – HWY 3 and 4 – Issuance - Review Comment Table - Mar 15_24.pdf (4.81 MB)
Preliminary Screening
Document Received/Sent Uploaded
GNWT – INF – HWY 3 and 4 – Notification - Preliminary Screening Determination - Mar19_24.pdf (235.69 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT-INF - HWY 3 and 4 - Inspection Report - September 24, 2024 - Sept 25_24.pdf (4.94 MB)
GNWT - INF - Inspection Report - June 5 2024 - June6_24.pdf (6.42 MB)
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
GNWT – INF – HWY 3 and 4 - Spill Contingency Plan V2.0 - Review Comment Table - Jun26_24.pdf (113.88 KB)
GNWT – INF - HWY 3 and 4 – Approval - Spill Contingency Plan V2.0 - Jun26_24.pdf (174.46 KB)
GNWT - INF - HWY 3 and 4 - Spill Contingency Plan Version 2.0 - Apr26_24.pdf (1.23 MB)
Waste Management Plan
Document Received/Sent Uploaded
GNWT – INF - HWY 3 and 4 – Waste Management Plan V2.0 - Review Comment Table - Jun26_24.pdf (114.5 KB)
GNWT – INF - HWY 3 and 4 – Approval - Waste Management Plan V2.0 - Jun26_24.pdf (172 KB)
GNWT - INF - HWY 3 and 4 - Waste Management Plan Version 2.0 - Apr26_24.pdf (335.8 KB)