Skip to main content

GNWT-INF - MV2023X0039

​The project is to replace the existing culver crossing of the Redknife River with a clear span bridge across the channel. 


Associated with Water Licence MV2023L8-0015.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
GNWT-INF - Redknife River Bridge - Preliminary Screening Determination and RFD - May2_24.pdf (543.72 KB)