GNWT-INF - MV2023S0038
Status:
Issued
Authorization:
Land Use Permit
Activity:
Geotechnical
Start:
February 16, 2024
Expiry:
February 15, 2026
Staff:
Tyree Mullaney
Small geotechnical investigation for long term care facility in Hay River, Soil and rock sampling, Monitoring wells and multi bead ground temperature cable to measure ground temperature and ground water levels.
Displaying 1 - 14 of 14
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - Geotech - Issuance - Type A Land Use Permit - Feb 16_24.pdf (923.84 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - Geotech - Land Use Permit Application - Dec20_23.pdf (711.45 KB) | ||
GNWT - INF - Geotech - Engagement Plan and Log - Dec21_23.pdf (2.31 MB) | ||
GNWT - INF - Geotech - Waste Management Plan - Dec21_23.pdf (1.12 MB) | ||
GNWT - INF - Geotech - Spill Contingency Plan - Dec21_23.pdf (1.66 MB) | ||
GNWT - INF - Geotech - Project Description - Dec21_23.pdf (1.12 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - Geotech - Issuance - Review Comment Table - Feb 5_24.pdf (931.25 KB) | ||
GNWT-INF - Draft Permit Conditions- Board Staff Developed - Dec21_23.docx (110.14 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT - INF - Geotech - Notification - Preliminary Screening Determination - Feb 5_24.pdf (420.87 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Inspection Report - February 26, 2024 - Oct 2_24.pdf (1.42 MB) | ||
GNWT-INF - Inspection Report - October 1, 2024 - Oct 2_24.pdf (2.73 MB) | ||
GNWT-INF - Inspection Report - March 7, 2024 - Oct 2_24.pdf (1.72 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Geotech - Notification of Geotechnical Drilling Investigation Complete - Mar 6_23.pdf (1.45 MB) | ||
GNWT-INF - Geotech - Proposed Borehole Location Plan - Feb 22_24.pdf (606.56 KB) |