Skip to main content

Kennady Diamonds - MV2023L2-0011

​Explore newly acquired claims for diamond deposits and mineral potential and involves drilling, mini bulk sampling, and transport of equipment and samples by winter road.

Bulk sampling of kimberlite using diamond drill rigs and trenching to obtain a 50 tonne sample for test milling and diamond recovery via DMS (Dense Media Separation). Possible future bulk sampling.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
KDI - 2024 Annual Report - SNP RAW DATA - Mar28_25.xlsx (23.36 KB)
KDI - 2024 Annual Report - Mar28_25.pdf (1.27 MB)