Skip to main content

GNWT-ECC - MV2022X0004

​The GNWT to complete a supplemental environmental site assessment and risk assessment at the Ptarmigan, Tom, Tin, Burwash, Rodstrom and Crestaurum Mine sites to determine current site conditions.

GNWT to place boulders to restrict vehicular traffic into the Ptarmigan Mine site proper and apply a dust suppressant to the Tailings Containment Area.

Installation and repair of fencing and signage at the site will also occur if required to restrict public access to the Ptarmigan, Tom and Tin Mine sites.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
GNWT-ENR - Issuance - Type A Land Use Permit - Jun6_22.pdf (935.04 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT-ENR - Engagement Plan V2 - May12_22.pdf (185.39 KB)
GNWT-ENR - Spill Contingency Plan V.2 - May12_22.pdf (1.46 MB)
GNWT-ENR - Engagement Plan - Apr6_22.pdf (185.72 KB)
GNWT-ENR - Map - Apr6_22.pdf (481.29 KB)
GNWT-ENR - Spill Contingency Plan - Apr6_22.pdf (1.29 MB)
GNWT-ENR - Waste Management Plan - Apr6_22.pdf (148.73 KB)
GNWT-ENR - Letter of Eligibility - Apr6_22.pdf (302.02 KB)
GNWT-ENR - Application - Apr6_22.pdf (567.67 KB)
GNWT-ENR - Engagement Record - Apr6_22.pdf (354.84 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
GNWT - ENR - Draft Conditions - Apr14_22.pdf (311.25 KB)
Preliminary Screening
Document Received/Sent Uploaded
GNWT-ENR - Notification - Preliminary Screening Determination - May27_22.pdf (438.67 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
GNWT - INF - Inspection Report - Jun20_24.pdf (1.81 MB)
GNWT-ECC - Inspection Report - October 17, 2023 - Oct17_23.pdf (1.14 MB)
Operations and Notifications
Document Received/Sent Uploaded
GNWT-ECC - Ptarmigan Mine Notification - Oct 12_23.pdf (986.92 KB)
GNWT-ECC - Ptarmigan Mine Notification - June 5_23.pdf (255.26 KB)