Skip to main content

City of Yellowknife - MV2021X0023

​The City of Yellowknife 2022 winter geotechnical drilling program involving specific sections of five City roads. Approximately 20 boreholes will be advanced using an auger drill (equipped with a rock hammer)  either to bedrock or to a depth where ice rich permafrost is not encountered.

The five City road sections to be evaluated are as follows:
・ Franklin Avenue between 44 Street and 41 Street (Franklin Hill) 
・ 44 Street between Franklin Ave. and the driveway for Kimberlite Career and Technical Centre (44 Street hill) 
・ 49A Avenue between 43 Street and 41A Street
・ Deh Cho Blvd between Kam Lake Road and Ellesmere Drive 
・ Kam Lake Road between Coronation Drive and Curry Drive 


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
City of Yellowknifer - LUI Notification - Cessastion of Drilling - Apr8_22.pdf (3.13 MB)