Skip to main content

Imperial Oil Limited - MV2021X0019

​D​uring the months of December 2021 and January 2022, the well will be re-entered to perform a remediation of the existing abandonment. Monitoring of the well will occur before and after remedial works to determine the success of the re-abandonment.



Accompanied by Water Licence MV2021L1-0009

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
Imperial Oil Limited - Annual Review of Plans - Mar31_23.pdf (133.48 KB)
Imperial Oil Limited. - Drilling Fluid Components Used - Feb3_23.pdf (107.82 KB)
Imperial Oil - 10 day Notification of Completion - Jan31_23.pdf (156.23 KB)
Imperial Oil - 10 Day Notification - Temporary Pause of Operations - Dec19_22.pdf (199.12 KB)
Imperial Oil - Notification - Commencement of Land Use Operation - Nov23_22.pdf (161.65 KB)