Skip to main content

Suncor Energy Inc. - MV2021X0015

​Downhole and surface abandonment/reclamation of the Tathlina N-18 well site located southwest of Hay River and Tathlina Lake. On-site work to take place Summer of 2022. Plans for Summer 2021 do not require a permit.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
6. Management Plans
Waste Management Plan
Document Received/Sent Uploaded
Suncor Energy - Tathlina - Waste Management Plan V.1 - July 6_21.pdf (2.59 MB)