Skip to main content

Suncor Energy Inc. - MV2021X0015

​Downhole and surface abandonment/reclamation of the Tathlina N-18 well site located southwest of Hay River and Tathlina Lake. On-site work to take place Summer of 2022. Plans for Summer 2021 do not require a permit.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Suncor Energy - Sept 20 Inspection Report - Sept 26_22.pdf (2.27 MB)
Suncor Energy - Inspection Report - August 25, 2022 - Sep13_22.pdf (3.36 MB)