Skip to main content

Slave Lake Zinc - MV2021L8-0008


Slave Lake Zinc is applying for a Type B Water License to support a seasonal temporary 49-person Camp and three drills. The camp will likely operate from about the beginning of February to the end of March annually for sixty (60) days and then from the beginning of June to the end of September annually, for about 92 days. Exploration activities proposed include diamond drilling (approximately 100 holes annually), airborne/ground geophysical survey prospecting, sampling (mechanized and by hand). Associated Permit: MV2016C0037

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Slave Lake Zinc - Spill Contingency Plan - Version 1.2 - Sept24_21.pdf (2.7 MB)
Slave Lake Zinc - Spill Contingency Plan - Version 1.2 - Staff Confirmation of Conformity - Sept27_21.pdf (147.77 KB)
Waste Management Plan
Document Received/Sent Uploaded
Slave Lake Zinc - Waste Management Plan - Verson 1.2 - Staff Confirmation of Conformity - Oct 18_21.pdf (156.85 KB)
Slave Lake Zinc - Waste Management Plan - Waste Acceptance Letter from KBL - Oct15_21.pdf (189.15 KB)
Slave Lake Zinc - Waste Management Plan V1.2 - Oct14_21.pdf (789.31 KB)