Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 21 of 21
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
CZN - Annual Management Plan Review - 2024 - March12_24.pdf (155.96 KB)
CZN - Type A Licence and Permit - Submission Requirements - Oct17_22.pdf (143.68 KB)
Engagement Plan
Document Received/Sent Uploaded
CZN – Approved - Engagement Plan V2 - Apr26_23.pdf (183.24 KB)
CZN - Engagement Plan - Version 2 - Mar 2_23.pdf (1.16 MB)
CZN - Engagement Plan V2 - Incomplete - Jan10_23.pdf (177.52 KB)
CZN - Engagement Plan V2 - Incomplete Conformity Review - Jan10_23.pdf (84.21 KB)
CZN - Mineral Exploration - EP V1 - July 21-20.pdf (1.63 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
CZN - Mineral Exploration - SCP V2 - Sept23-20.pdf (9.25 MB)
Waste Management Plan
Document Received/Sent Uploaded
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB)
Waste Rock and Tailings Management
Document Received/Sent Uploaded
CZN - Mineral Exploration - GVP V2.2 - Sept25-20.pdf (1020.79 KB)
Water Management
Document Received/Sent Uploaded
CZN – Water and Wastewater Management Plan V1.1 - Review Comments and Responses.pdf (393.08 KB)
CZN - Water and Wastewater Management Plan - Version 1.2 - May 31_23.pdf (9.23 MB)
CZN - Water and Wastewater Management Plan - Version 1.2 - Board Staff Conformity - June 1_23.pdf (149.54 KB)
CZN – Water and Wastewater Management Plan - Version 1 - Review Comments and Responses - Mar 2_23.pdf (363.06 KB)
CZN – Revisions Required - Water and Wastewater Management Plan - Version 1.1 - May 17_23.pdf (214.57 KB)
CZN - Water and Wastewater MP - V1.1 - Apr11_23.pdf (9.23 MB)
CZN - Letter to MVLWB re Water and Wastewater Management Plan V1 - Mar10_23.pdf (218.46 KB)
CZN – Not Approved - Water and Wastewater Management Plan Version 1 - Mar3_23.pdf (265.62 KB)
CZN - Water and Wastewater MP - Version 1 - Nov24_22.pdf (6.48 MB)
CZN - Mineral Exploration - ETP V5 - Aug 19_21.pdf (3.17 MB)
CZN - Mineral Exploration - MTCP V5 - Aug 19_21.pdf (301.49 KB)