To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 40 of 40
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - 2023 Water License Annual Report - Mar29_24.pdf (1.61 MB)
CZN – 2022 Annual Report - Review Comment Table - Jul20_23.pdf (613.4 KB)
CZN – Acknowledgement - 2022 Annual Report - Jul 25_23.pdf (171.38 KB)
CZN - 2022 Annual Report - Tabulated SNP Results - May 19_23.xls (77.5 KB)
CZN - 2022 Annual Report - Tabulated SNP Results EQC - May 19_23.xls (248.5 KB)
CZN - 2022 Water License Annual Report - May 24_23.pdf (37.18 MB)
CZN - 2022 Annual Report - 3-4 Diss Zn vs Colourimetric Zn - May 19_23.xlsx (33.55 KB)
CZN - 2022 Annual Report - 3-4 pH vs Colourimetric Zn - May 19_23.xlsx (33.55 KB)
Designs and As-Builts
Document Received/Sent Uploaded
CZN - Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1.1 - Feb22_24.pdf (82.4 MB)
CZN - Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1.1 - Cover Letter - Jan9_24.pdf (184.27 KB)
CZN - Approval - Flood Protection Berm and Water Storage Pond Evaluation Report – Submission Extension - Dec 7_23.pdf (171.7 KB)
CZN - Flood Protection Berm and Water Storage Pond Southern Dyke Evaluation Report - Extension Request - Nov16_23.pdf (132.64 KB)
CZN - Revisions Required - Flood Protection Berm and Water Storage Pond Southern Dyke Evaluation Report - Nov 7_23.pdf (598.53 KB)
CZN - Flood Protection Berm and WSP Southern Dyke - Evaluation Report - V1 - May 19_23.pdf (41.88 MB)
CZN - Letter Re Flood Protection Berm and WSP Southern Dyke Evaluation Report - V1 - May 24_23.pdf (222.44 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - Geotechnical Inspection Requirements - Correspondence - Dec5_23.pdf (234.13 KB)
CZN - Flood Protection Berm and Water Storage Pond - 2023 Annual Geotechnical Inspection - Nov22_23.pdf (56.56 MB)
CZN - Inspection Report - Apr28_23.pdf (2.71 MB)
CZN - Flood Protection Berm and Water Storage Pond - 2022 Annual Geotechnical Inspection - Mar 29_23.pdf (32.8 MB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - 2024 Site Opening Notification - Mar15_24.pdf (104.85 KB)
CZN - Annual Review Condition - Mar1_23.pdf (163.33 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - Mine and ASR - SNP - Analytical Results May-Nov 2023 - Dec18_23.xlsx (245.6 KB)
CZN - SNP Report - Sep 29 - Oct 31 2022.pdf (10.54 MB)
CZN - SNP Correspondence - Dec 2023 - Jan10_24.pdf (200.3 KB)
CZN - SNP Report - April 2023 - Jan4_24.pdf (706.74 KB)
CZN - SNP Report - Feb 2023 - Jan4_24.pdf (690.77 KB)
CZN - SNP Report - Jan 2023 - Jan4_24.pdf (681.25 KB)
CZN - SNP Report - March 2023 - Jan4_24.pdf (694.07 KB)
CZN - SNP Report - Water Use Information - 2023 - Jan4_24.pdf (190.23 KB)
CZN - SNP Report - Aug 2023 - Dec18_23.pdf (4.45 MB)
CZN - SNP Report - July 2023 - Dec18_23.pdf (9.64 MB)
CZN - SNP Report - June 2023 - Dec12_23.pdf (4.91 MB)
CZN - SNP Report - May 2023 - Dec22_23.pdf (2.12 MB)
CZN - SNP Report - Nov 2023 - Dec20_23.pdf (2.85 MB)
CZN - SNP Report - Oct 2023 - Dec20_23.pdf (5.98 MB)
CZN - SNP Report - Sept 2023 - Dec18_23.pdf (4.59 MB)
CZN - SNP Report June 1 - 31_23 - Dec12_23.pdf (5.64 MB)
CZN - Mine - QAQC and SNP Requirements not met - Nov30_23.pdf (145.74 KB)
CZN - SNP Report May 21 - Jun 19 - July 21_23.pdf (3.51 MB)