Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 19 of 19
5. Reports and Studies
SNP Reports
Document Received/Sent Uploaded
CZN - Mine and ASR - SNP - Analytical Results May-Nov 2023 - Dec18_23.xlsx (245.6 KB)
CZN - SNP Report - Sep 29 - Oct 31 2022.pdf (10.54 MB)
CZN - SNP Correspondence - Dec 2023 - Jan10_24.pdf (200.3 KB)
CZN - SNP Report - April 2023 - Jan4_24.pdf (706.74 KB)
CZN - SNP Report - Feb 2023 - Jan4_24.pdf (690.77 KB)
CZN - SNP Report - Jan 2023 - Jan4_24.pdf (681.25 KB)
CZN - SNP Report - March 2023 - Jan4_24.pdf (694.07 KB)
CZN - SNP Report - Water Use Information - 2023 - Jan4_24.pdf (190.23 KB)
CZN - SNP Report - Aug 2023 - Dec18_23.pdf (4.45 MB)
CZN - SNP Report - July 2023 - Dec18_23.pdf (9.64 MB)
CZN - SNP Report - June 2023 - Dec12_23.pdf (4.91 MB)
CZN - SNP Report - May 2023 - Dec22_23.pdf (2.12 MB)
CZN - SNP Report - Nov 2023 - Dec20_23.pdf (2.85 MB)
CZN - SNP Report - Oct 2023 - Dec20_23.pdf (5.98 MB)
CZN - SNP Report - Sept 2023 - Dec18_23.pdf (4.59 MB)
CZN - SNP Report June 1 - 31_23 - Dec12_23.pdf (5.64 MB)
CZN - Mine - QAQC and SNP Requirements not met - Nov30_23.pdf (145.74 KB)
CZN - SNP Report May 21 - Jun 19 - July 21_23.pdf (3.51 MB)
CZN - SNP Report Sep 29 - Dec 31 - Jan 20_23.pdf (8.49 MB)