Skip to main content

Canadian Zinc Corporation - MV2021L2-0004

​Allied Permit: MV2021D0005

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
CZN – Schedule 6 Change - Dec 21_23.pdf (1.27 MB)
CZN – Workplan Extension Request and Administrative Updates - Oct5_23.pdf (1.25 MB)
Canadian Zinc Corporation - Issuance - Type A Water Licence - Sep 23_22.pdf (3.22 MB)
CZN - ANNEX A - Ministerial Approval Letter - Sep 23_22.pdf (762.63 KB)
Canadian Zinc Corporation - Board Recommendation - Type A Water Licence - Aug10_22.pdf (3.08 MB)