Skip to main content

Imperial Oil Limited - MV2021L1-0009

D​uring the months of December 2021 and January 2022, the well will be re-entered to perform a remediation of the existing abandonment. Monitoring of the well will occur before and after remedial works to determine the success of the re-abandonment.


Accompanied by Land Use Permit MV2021X0019

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Other
Document Received/Sent Uploaded
Imperial Oil - Updated Engagement Log for JMR B-48 - Mar28_25.pdf (490.43 KB)
8. Closure and Reclamation
Other
Document Received/Sent Uploaded
Imperial Oil - JMR - Phase II ESA 2024 - Dec13_24.pdf (19.04 MB)