Skip to main content

Imperial Oil Limited - MV2021L1-0009

D​uring the months of December 2021 and January 2022, the well will be re-entered to perform a remediation of the existing abandonment. Monitoring of the well will occur before and after remedial works to determine the success of the re-abandonment.


Accompanied by Land Use Permit MV2021X0019

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Imperial Oil - Water Licence - Draft Conditions.docx (221.11 KB)
Imperial Oil - Water Licence - Draft Conditions.pdf (532.42 KB)