GNWT-MTS - MV2021L1-0001

​The operation will consist of the following:

  • On-going removal of bilge/barge water from all company vessels and barges located in the Hay River NT area.
  • Bilge/barge water will then be stored at Syncro tank farm located in Hay River, NT.
  • Bilge/ barge water will be put through process including an Oil Water Separator (OWS).
  • Bilge/ barge water will be monitored through the OWS system in Parts Per Million (PPM) for oil content.
  • Processed water out from the OWS will then be stored in a clean tank with analytical water samples taken.
  • If water meets criteria, water will be discharged on approval 