Skip to main content

GNWT-MTS - MV2021L1-0001

​The operation will consist of the following:

  • On-going removal of bilge/barge water from all company vessels and barges located in the Hay River NT area.
  • Bilge/barge water will then be stored at Syncro tank farm located in Hay River, NT.
  • Bilge/ barge water will be put through process including an Oil Water Separator (OWS).
  • Bilge/ barge water will be monitored through the OWS system in Parts Per Million (PPM) for oil content.
  • Processed water out from the OWS will then be stored in a clean tank with analytical water samples taken.
  • If water meets criteria, water will be discharged on approval 


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
MV2020L1-0001 - GNWT - MTS - Notification - Preliminary Screening Determination to Review Board - May20-21.pdf (394.8 KB)