Canadian Zinc Corporation - MV2021D0005

​Allied Licence: MV2021L2-0004

To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.

Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
8. Closure and Reclamation
Conceptual Closure and Reclamation Plan
Document Received/Sent Uploaded
CZN - Closure and Reclamation - Work Plan V1 - Mar12_24.pdf (409.33 KB)
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
CZN – Closure and Reclamation Plan V2 - Review Comments and Responses - Jun5_23.pdf (597.97 KB)
CZN – Deferral - Closure and Reclamation Plan - Version 2 - May 17_23.pdf (172.11 KB)
Progressive Reclamation
Document Received/Sent Uploaded
CZN - 2024 Progressive Reclamation - Notification - None Occurring - Mar12_24.pdf (118.39 KB)