Skip to main content

Hamlet of Fort Providence - MV2020X0001

​Geotechnical investigation drilling to provide engineering design to upgrade the Fort Providence water treatment and supply system (water storage resevior).  

Application withdrawn; eligibility requirements were not met on the IAB lands. Reapplied for and issued as Permit MV2020X0012. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
2. Initial/Renewal Application
Withdrawal - Return - Denial
Document Received/Sent Uploaded
MV2020X0001 - Hamlet of Fort Providence - Geotechnical Investigation - Application Withdrawn - Fee Statement - Apr30-20.pdf (173 KB)
MV2020X0001 - Hamlet of Fort Providence - Application Withdrawal - Apr-24_20.pdf (160.52 KB)