Skip to main content

Northwest Territories Power Corporation - MV2020L4-0005

​Bluefish Power Generation Facility, located at the north end of Propserous Lake, NT.

Renewal of Licence MV2005L4-0008.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
NTPC - Bluefish - 2023 Annual Report - Apr2_24.pdf (1011.76 KB)
NTPC - Bluefish - 2022 Annual Water Licence Report - May31_23.pdf (948.21 KB)
NTPC - Bluefish - 2022 Annual Water Licence Report - Appendix A and B - May31_23.xlsx (4.06 MB)
NTPC - Bluefish - 2022 Annual Dam Safety Inspection Report - Nov10_22.pdf (7.05 MB)
NTPC - Bluefish - 2022 Annual Dam Safety Inspection Report - Response Letter - Nov10_22.pdf (363.27 KB)
NTPC - Bluefish - 2021 Annual Report - Apr14_22.pdf (3.87 MB)
NTPC - Bluefish - 2021 Annual Report - Deferal Request - Mar30_22.pdf (136.19 KB)