Skip to main content

Sixty North Gold Mining Ltd. - MV2020L2-0002

​Mineral Exploration new Discovery Lake. All exploration and development work will be focused on four initiatives:

1. Underground development and sampling of the A-Zone

2. Expansion of the A-Zone laterally and to depth

3. Exploration of potential shear zone gold targets

4. Exploration of volcanogenic massive sulphide (VMS) targets.


Previouly, Water Licence MV2014L2-0002 and Permit MV2013C0021) and mining and milling (Licence MV2015L2-0004 and MV2015C0015).

 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
6. Management Plans
Waste Rock and Tailings Management
Document Received/Sent Uploaded
NDM - Waste Rock Management and Geochemical Characterization Plan - Version 1.6 - Mar16_22.pdf (7.45 MB)
NDM - Waste Rock and Geochemical Characterization Plan - Version 1.6 Cover Letter - Mar16_22.pdf (67.34 KB)
NDM – Waste Rock Management and Geochemical Characterization Plan v1.5 - Staff Report and Comments - Feb3_22.pdf (646.67 KB)
NDM – Resubmission Required - Waste Rock Management and Geochemical Characterization Plan v1.5 - Jan31_22.pdf (171.72 KB)
NDM - Waste Rock Management and Geochemical Characterization Plan - Version 1.5 - Nov29_21.pdf (7.9 MB)
NDM - Resubmission Required - Waste Rock Mgmt and Geochem Plan v1 - Sep25_21.pdf (166.55 KB)
NDM - Waste Rock Management and Geochemical Characterization Plan - Version 1.4 - Jul29-21.pdf (9.26 MB)
MV2020L2-0002 - NDM - Waste Rock Management and Geochemical Characterization Plan - Version 1.3 - Jul1-21.pdf (9.37 MB)
MV2020L2-0002 - NDM - Not Approved - Waste Rock and Geochem Management Plans V1.2 - June 4 2021 - Jun17-21.pdf (282.43 KB)
MV2020L2-0002 MV2020C0003 - NDM - Waste Rock Management Plan R1 - Apr-19-21.pdf (6.75 MB)
MV2020L2-0002 MV2020C0003 - NDM - EBA Conceptual Design for Dry Stack Tailings Option - Chosen - Aug26-20.pdf (686.49 KB)
MV2020L2-0002 MV2020C0003 - NDM - EBA Conceptual Design for Tailings Storage Facility Option - Not Chosen - Aug26-20.pdf (5.86 MB)
MV2020L2-0002 MV2020C0003 - NDM - 2014 Project Report for Metallurgical Testing on Sampled from NDM - Aug26-20.pdf (915.68 KB)
MV2020L2-0002 MV2020C0003 - NDM - Confirmatory Metallurgical Testing of Samples from NDM - Aug26-20.pdf (692.39 KB)
MV2020L2-0002 MV2020C0003 - NDM - Dry Stack Tailings Description - May4-20.pdf (686.49 KB)
MV2020L2-0002 MV2020C0003 - NDM - Process Tailings Summary - May4-20.pdf (497.76 KB)