Skip to main content

Valard Construction (Telecom Division) - MV2019X0020

​Installation of a fibre optic cable from the NorthwesTel Central office in the community of Jean Marie River to an existing Handhole at the junction of the Mackenzie Highway. Placement will be within the right-of-way of the Jean Marie Highway

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 9 of 9
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2019X0020 - Valard Construction - Inspection Report - Jan18_21.pdf (2.18 MB)
MV2019X0020 - Valard Construction - Inspection Report July 24-20 - Aug10_20.pdf (1.2 MB)
MV2019X0020 - Valard - Inspection Report June 9, 2020 - July20_20.pdf (3.59 MB)
MV2019X0020 - Valard - Reponse to Inspection Report June 9-20 - July20_20 (2).pdf (277.75 KB)
MV2019X0020 - Valard - Inspection Report - Feb19-20 - Feb21_20.pdf (1.51 MB)
MV2019X0020- Valard Construction - Inspection Report - Feb3_20.pdf (1.07 MB)
MV2019X0020- Valard Construction- Inspection Report-Dec9-19 - Dec 16_19.pdf (8.16 MB)
MV2019X0020 - Valard Constructino - Inspection Report Nov26-19 - Nov27_19.pdf (2.28 MB)
MV2019X0020 - Valard Construction- Inspection Report Nov8_19 - Nov15_19.pdf (2.46 MB)