Skip to main content

Northwest Territories Power Corporation - MV2019L8-0008

Reconstruction of the historical Taltson Winter Road from Fort Smith to Taltson that was used in the 1960s, 

Accompanied by Permit MV2019F0015.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Other
Document Received/Sent Uploaded
NTPC - Taltson Winter Road - Field Verification Report - Jan30_2024.pdf (6.44 MB)
NTPC - Taltson - Winter Road - Notification Map - Dec24_22.pdf (558.51 KB)