Skip to main content

Canadian Zinc Corporation - MV2019L2-0006

​Licence Cancelled - April 26, 2023. All activities are scoped under Licence MV2021L2-0004.


To develop a new decline from the existing 880 m level, including pumping, treatment and discharge of water inflows using the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on an existing waste rock pad near the 870 m level portal. 

On-site surface exploration drilling. Connected with Permit MV2020C0008. Previously authorized under MV2001L2-0003.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 16 of 16
5. Reports and Studies
SNP Reports
Document Received/Sent Uploaded
CZN - SNP Report - July19-Aug23_22 Revised - Dec12_22.pdf (9.8 MB)
CZN - SNP Report - Aug31-Sep19, 2022 - Nov25_22.pdf (6.74 MB)
CZN - SNP Report - July 19 - August 23, 2022 - Oct26_22.pdf (9.9 MB)
CZN - SNP Report - Oct 12 - Nov 3 2021 - Revised - May17_22.pdf (7.8 MB)
CZN - SNP Report - Oct 12 to Nov 3 - Jan13_22.pdf (4.08 MB)
CZN - SNP Report - Sept 4 to Oct 5, 2021 - Nov4_21.pdf (2.93 MB)
CZN - SNP Report - Aug 17 to Sept 7, 2021 - Oct7_21.pdf (2.65 MB)
CZN - SNP Report - Jul 20 to Aug 10 2021 - Sep13_21.pdf (2.52 MB)
CZN - SNP Report - June 17-July 13, 2021 - Aug15_21.pdf (3.16 MB)
MV2019L2-0006 - SNP Report - Dec19_20.pdf (2.27 MB)
MV2019L2-0006 - CZN - SNP Report - Oct 15_20.pdf (3.3 MB)
MV2019L2-0006 - CZN - SNP Report - Sep 17_20.pdf (5.45 MB)
MV2019L2-0006 - CZN - SNP Report Jul 23 - Aug 13 - Sept10-20.pdf (2.84 MB)
MV2019L2-0006 - CZN - revised SNP Report Sept to Nov - Jan20_20.pdf (1.71 MB)
MV2019L2-0006 - CZN - 2019 Sept Oct SNP Report Inconformity - Dec 5-19.pdf (1.17 MB)
MV2019L2-0006 - CZN - Aug SNP Report - Sept 25-19.pdf (1.63 MB)