Skip to main content

Northwest Territories Power Corporation - MV2019L1-0001

Jackfish Power Generating Facility, located on the northeast shore of Jackfish Lake in Yellowknife, Northwest Territories. The facility contributes power to the North Slave electrical system when required.

Previously licenced by Water Licence N1L1-1632.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 29 of 29
5. Reports and Studies
Other
Document Received/Sent Uploaded
NTPC - Jackfish - Thermal Plume Report - V1.1 - Board Staff Conformity - Jun30_23.pdf (149.2 KB)
NTPC - Jackfish - Thermal Plume Delineation Study Report - Cover Letter - Jun30_23.pdf (91.21 KB)
NTPC - Jackfish - Thermal Plume Delineation Study - V1.1 - Jun27_23.pdf (92.71 MB)
NTPC - Jackfish - Thermal Plume Delineation Study - V1.1 - Appendix C - Water Level Outflow Compiled - Jun27_23.xlsx (32.2 KB)
NTPC - Jackfish - Thermal Plume Delineation Study - V1.1 - Appendix D.1 - Temp Logger Data Compiled - Jun27_23.xlsx (21.36 MB)
NTPC - Jackfish - Thermal Plume Delineation Study - V1.1 - Appendix D.2 - Thermistor Data Compiled - Jun27_23.xlsx (7.43 MB)
NTPC - Jackfish - Thermal Plume Delineation Study - V1.1 - Appendix F - Jun27_23.xlsx (558.32 KB)
NTPC – Jackfish – Thermal Plume Delineation Study Report v1 - Review Comments and Responses - Jun1_23.pdf (737.47 KB)
NTPC – Jackfish – Revisions Required - Thermal Plume Delineation Study Report v1 - May31_23.pdf (439.48 KB)
NTPC - Jackfish - Thermal Plume Delineation Study Report - Mar9_23.pdf (26.94 MB)
NTPC - Jackfish - Thermal Plume Study Report - Cover Letter - Mar7_23.pdf (258.94 KB)
NTPC - Jackfish - Thermal Plume Delineation Study - Appendix C - Mar7_23.xlsx (31.86 KB)
NTPC - Jackfish - Thermal Plume Delineation Study - Appendix D - Mar9_23.pdf (18.62 MB)
NTPC - Jackfish - Thermal Plume Delineation Study - Appendix E - Mar9_23.pdf (35.96 MB)
NTPC - Jackfish - Thermal Plume Delineation Study - Appendix F - Mar7_23.xlsx (558.4 KB)
NTPC - Jackfish - Thermal Plume Delineation Study Report - Appendix E.7 - Mar7_23.pdf (6.56 MB)
NTPC - Jackfish - Extension Request - Thermal Plume Study - Jan17_23.pdf (36.4 KB)
MV2019L1-0001 - NTPC - Jackfish - Jacfish Lake Thermal Plume Study Design_v2.1 - May28_21.pdf (6.04 MB)
MV2019L1-0001 - NTPC - Jackfish - Compliane Date Change- March5_21.pdf (80.86 KB)
MV2011L4-0002 MV2005L4-0008 MV2019L1-0001 - NTPC - File Audit - Missing Submissions and Response from Inspector - Jan29_21.pdf (516.89 KB)
MV2019L1-0001 - NTPC - Thermal Plume Study Design - Staff Report and Comments - Oct8-20.pdf (1.07 MB)
MV2019L1-0001 - NTPC - Approval - Thermal Plume Study Design - Oct9-20.pdf (182.1 KB)
MV2019L1-0001 - NTPC - Jackfish Lake Thermal Plume Study Design - July16_20.pdf (4.65 MB)
MV2019L1-0001 - NTPC - Jackfish - Compliance Date Change - Staff Report and Comments - Jun16-20.pdf (819.79 KB)
MV2019L1-0001 - NTPC - Approval - Deferral - Submission Dates - May 28 2020 - Jun3-20.pdf (581.54 KB)
MV2019L1-0001 - NTPC - Jackfish - Instrumentation Study - V2 - Apr24_20.pdf (118.51 KB)
MV2019L1-0001 - NTPC - Jackfish - Instrumentation Study - V.2 - Apr24_20.pdf (295.18 KB)
MV2019L1-0001 - NTPC - Jackfish - Thermal Plume Study Design - Jan16_20.pdf (4.75 MB)
MV2019L1-0001 - NTPC - Jackfish - Thermal Plume Delineation Study Design Plan and SOP. - Jan28_20.pdf (164.52 KB)