Skip to main content

Sambaa Ke First Nation - MV2018L3-0001

​Municipal Water Licence for the withdrawl of drinking water, and disposal of sewage and waste at the SKFN's water treatment plant, sewage lagoon, and solid waste facilities.  Replaces MV2012L3-0007.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 26 of 26
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2018L3-0001 - SKFN - Annual Report Template - Feb2019.pdf (329.61 KB)
Designs and As-Builts
Document Received/Sent Uploaded
SKFN – SWDF Design and Construction Plan Version 2 - Staff Report and Comments - Feb24_22.pdf (608.25 KB)
SKFN – SDF Design and Construction Plan Version 2 - Staff Report and Comments - Feb24_22.pdf (557.42 KB)
SKFN - Solid Waste Design and Construction Plan V2.1 - Mar14_22.pdf (3.34 MB)
SKFN - Sewage Disposal Facilities Design and Construction Plan V2.1 - Mar14_22.pdf (8.2 MB)
SKFN - Solid Waste Disposal Facilities Design and Construction Plan V2.1 - Confirmation of conformity - Mar14_22.pdf (183.64 KB)
SKFN - Sewage Disposal Facilities Design and Construction Plan V2.1 - Confirmation of conformity - Mar14_22.pdf (183.52 KB)
SKFN – Resubmission Required - SDF Design and Construction Plan Version 2 - Feb25_22.pdf (133.48 KB)
SKFN – Resubmission Required - SWDF Design and Construction Plan Version 2 - Feb25_22.pdf (132.78 KB)
SKFN - SWDF Design and Construction Plan V2 - Feb1_22.pdf (3.05 MB)
SKFN - Sewage Disposal Facilities Design and Construction Plan V2 - Feb1_22.pdf (8.51 MB)
SKFN - Notification of Design Drawings for Waste Disposal Facilities upgrades - Dec14_21.pdf (93.98 KB)
SKFN - Design Drawings for Sewage Disposal Facilities upgrades - Dec13_21.pdf (19.4 MB)
SKFN - Design and Construction Plan - Sewage Disposal Facilities upgrades - Dec13_21.pdf (20.03 MB)
SKFN - Design Drawings for Solid Waste Disposal Facilities upgrades - Dec13_21.pdf (18.1 MB)
SKFN - Design and Construction Plan - Solid Waste Disposal Facilities upgrades - Dec13_21.pdf (18.37 MB)
Inspection Reports
Document Received/Sent Uploaded
MV2018L3-0001 - SKFN - Inspection Report from October 3 2019 Inspection and SNP Report - Feb17-20.pdf (2.89 MB)
Operations and Notifications
Document Received/Sent Uploaded
SKFN - Correspondence re emergency lagoon decant - Apr15_24.pdf (182.8 KB)
SKFN - Emergency decant authorization and results from SNP 2018-4 - Mar20_24.pdf (503.64 KB)
SKFN - Inspector email re SWDF upgrades - Dec1_21.pdf (249.4 KB)
MV2018L3-0001 - SKFN - Emergency decant request and permission - May13-20.pdf (253.31 KB)
Other
Document Received/Sent Uploaded
MV2018L3-0001 - SKFN - Water quality sampling results 2004-2017 submitted with revised Application - Jun5-18.pdf (3.07 MB)
MV2018L3-0001 - SKFN - Sewage and Solid Waste Investigation Report March 2007 - Jun5-18.pdf (1.41 MB)
MV2018L3-0001 - SKFN - Hazardous Waste Removal Final Report March 2017 - Jun5-18.pdf (1.86 MB)
SNP Reports
Document Received/Sent Uploaded
SKFN - SNP Results for Station 2018-4 and Inspector Approval to Decant - May1_23.pdf (661.77 KB)
MV2018L3-0001 - SKFN - Inspector decant approval and SNP Results from stations 2018-3 and 2018-4 on Oct3 2019 - Oct18-19.pdf (451.78 KB)