Skip to main content

Pine Point Mining Limited - MV2018L2-0003

Conformitory drilling to support a fesaibility study in the Pine Point Disctrict. Water will be used to operate individual drills. Water will be sources from existing constructed features including mine pits and drainage ditches. 

Accompanied by Permit MV2018C0005. This project is split-interest and occurs in non-federal and federal areas.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2018L2-0003 - PPML - 2019 Annual Report with Waste Manifest - Aug12-20.pdf (1.8 MB)
MV2018L2-0003 - PPML - 2019 Annual Report - Staff Report - Jun16-20.pdf (212.77 KB)
MV2018L2-0003 - PPML - Accepted - 2019 Annual Report - May 28 2020 - Jun3-20.pdf (169.67 KB)
MV2018L2-0003 - PPML - 2019 Annual Water Licence Report - May 8-20.pdf (1.17 MB)
Inspection Reports
Document Received/Sent Uploaded
MV2018L2-0003 - PPML - Response to 2018 Inspection Report - Mar19-19.pdf (135.94 KB)
Operations and Notifications
Document Received/Sent Uploaded
MV2018L2-0003 - PPML - Water Source Notification - Jul20-18.pdf (377.14 KB)
MV2018C0005 MV2018L2-0013 - PPML - Drilling Target Notification - Jul24-18.pdf (6.38 MB)
MV2018C0005 MV2018L2-0013 - PPML - Drilling Target and Water Source Notification - Jul24-18.pdf (1.77 MB)
MV2018C0005 MV2018L2-0003 - PPML - Drilling Tartget and Water Source Notification - Drill pads 053 area - Jul24-18.pdf (1.56 MB)
MV2018C0005 MV2018L2-0003 - PPML - Drilling Tartget and Water Source Notification - Jul24-18.pdf (1.9 MB)
Spill Reports
Document Received/Sent Uploaded
MV2018C0005 MV2018L2-0003 - PPML - Notice of Spill Reports - Aug13-18.pdf (981.97 KB)