Skip to main content

Pine Point Mining Limited - MV2018L2-0003

Conformitory drilling to support a fesaibility study in the Pine Point Disctrict. Water will be used to operate individual drills. Water will be sources from existing constructed features including mine pits and drainage ditches. 

Accompanied by Permit MV2018C0005. This project is split-interest and occurs in non-federal and federal areas.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2018L2-0003 - PPML - 2019 Annual Report with Waste Manifest - Aug12-20.pdf (1.8 MB)
MV2018L2-0003 - PPML - 2019 Annual Report - Staff Report - Jun16-20.pdf (212.77 KB)
MV2018L2-0003 - PPML - Accepted - 2019 Annual Report - May 28 2020 - Jun3-20.pdf (169.67 KB)
MV2018L2-0003 - PPML - 2019 Annual Water Licence Report - May 8-20.pdf (1.17 MB)