Skip to main content

GNWT-INF - MV2017X0019

The continuous and ongoing operation and maintenance of the existing NWT public highway system within the permit corridor along the Mackenzie Highway (NWT #1) Corridor between km 0 (AB/NT border) and km 278 (Axe Handle area).

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
GNWT-INF – Approval - Extension to Term - May3_22.pdf (579.92 KB)
MV2017X0019 - GNWT-INF - Amendment Approval Letter - Sept20-18.pdf (728.57 KB)
MV2017X0019 - GNWT - Dept of Infrastructure - Issuance Letter with Permit-Conditions and RFD - Type A LUP - May15-17.pdf (1.29 MB)