GNWT-INF - MV2017X0018
Status:
Closed
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
May 15, 2017
Expiry:
May 14, 2024
Staff:
Tyree Mullaney
The continuous and ongoing operation and maintenance of the existing NWT Public Highway system within the permit corridor along the Fort Smith Highway (NWT no.5) between km 0 (intersection with Hay River Highway near km 32 and 266 and includes Hay River Reserve, Sandy Lake, Little Buffalo River Falls and Fort Smith Campground Access Roads and other minor roads along the Fort Smith Highway Corridor - Wood Buffalo National Park Route and as listed under the Public Highways Act for the GNWT.
Displaying 1 - 40 of 40
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
GNWT – Department of Infrastructure – Approval - Extension to Term - May3_22.pdf (582.76 KB) | ||
MV2017X0018 - GNWT - Dept of Infrastructure - Issuance Letter with Permit-Conditions and RFD - Type A LUP - May15-17.pdf (1.39 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0018 - GNWT - INF - 2021QP0014 Quarry Permit - May6_21.pdf (608.73 KB) | ||
MV2017X0018 - GNWT - INF - Quarry Permit Verification 2018QP0014 - May4_21.pdf (84.08 KB) | ||
MV2017X0018 - GNWT-INF - Issuance of 2019QP0029 - GNWT Lands - Jun3-19.pdf (308.46 KB) | ||
MV2017X0018 - GNWT-DOI - Issuance of 2019QP0029 - GNWT Lands - Jun3-19.pdf (308.46 KB) | ||
MV2017X0018 - GNWT-INF - Receipt of QP Application - GNWT Lands - May2-19.pdf (150.04 KB) | ||
MV2017X0018 - GNWT-INF - 2015QP0021 - Final QP Return - Verification - GNWT Lands - Aug17-18.pdf (89.5 KB) | ||
MV2017X0018 - GNWT-DOI - QP Issuance - 2018PQ0014 - GNWT Lands - Mar15-18.pdf (405.29 KB) | ||
MV2017X0018 - GNWT-DOI - Receipt of QP Application - GNWT Lands - Jan29-18.pdf (319.81 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT – INF – Approval - Final Plan and Clearance - Nov21_24.pdf (168 KB) | ||
GNWT - INF - Final Plan - Recommendation from Inspector - Oct15_24.pdf (170.42 KB) | ||
GNWT-INF - Final Plan - Sept 11_24.pdf (3.31 MB) | ||
GNWT-INF - Request for Final Plan - Jan 22_24.pdf (203.27 KB) | ||
GNWT-INF - Request for Final Plan or Extension - Jan20_22.pdf (160.69 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0018 - GNWT - Dept of Infrastructure - Issuance - Staff Report and Comments - May15-17.pdf (1.23 MB) | ||
MV2017X0018 - GNWT - DOT - New Permit Application - Request for Comment - Apr6-17.pdf (109.65 KB) | ||
MV2017X0018 - GNWT - DOT - Complete Letter.pdf (369.24 KB) | ||
MV2017X0018 - GNWT - DOT - Draft Conditions.docx (78.54 KB) | ||
MV2017X0018 - GNWT - DOT - New Application - Mar23-17.pdf (10.62 MB) |
4. Permit Extension Request
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF – Extension to Term - Staff Report and Comments - May6_22.pdf (287.75 KB) | ||
GNWT-INF - Extension Request - Apr4_22.pdf (710.75 KB) |
5. Reports and Studies