GNWT-INF - MV2017X0017
Status:
Closed
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
May 15, 2017
Expiry:
May 14, 2024
Staff:
Tyree Mullaney
The ongoing operation and maintenance of existing NWT Public Highway system along the Yellowknife Highway #3 between km 0 and km 124
Documents
Displaying 1 - 27 of 27
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
GNWT – Department of Infrastructure – Approval - Extension to Term - May3_22.pdf (575.24 KB) | ||
MV2017X0017 - GNWT - Dept of Infrastructure - Issuance Letter with Permit-Conditions and RFD - Type A LUP - May15-17.pdf (1.29 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT- INF - VERIFICATION Final Quarry Pit Return - May8_24.pdf (31.19 KB) | ||
GNWT_ INF- Quarry Permit from GNWT - 2024QP0011 - PERMIT - May10_24.pdf (415.86 KB) | ||
MV2017X0017 - GNWT-INF - Issuance of 2019QP0031 - GNWT Lands - Jun13-19.pdf (574.25 KB) | ||
MV2017X0017 - GNWT - INF - Closure of GNWT Quarry Permit 2015QP0029.pdf (455.1 KB) | ||
MV2017X0017 - GNWT-INF - Final QP Return- 2015QP0007 - Verification - GNWT Lands - Jun15-18.pdf (83.17 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
GNWT – INF – Approval - Final Plan and Clearance - Nov21_24.pdf (176.51 KB) | ||
GNWT-INF - Final Plan - Recommendation from Inspector - Oct 15_24.pdf (196.22 KB) | ||
GNWT - INF - Final Plan - Recommendation from Inspector - Oct15_24.pdf (170.42 KB) | ||
GNWT-INF - Final Plan - Updated - Oct 2_24.pdf (225.03 KB) | ||
GNWT-INF - Final Plan - Sept 11_24.pdf (2.26 MB) | ||
GNWT-INF - Request for Final Plan - Jan 22_24.pdf (203.27 KB) | ||
GNWT-INF - Request for Final Plan or Extension - Jan20_22.pdf (160.82 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0017 - GNWT - Dept of Infrastructure - Issuance - Staff Report and Comments - May15-17.pdf (1.28 MB) | ||
MV2017X0017 - GNWT - DOT - New Permit Application - Request for Comment - Apr6-17.pdf (114.51 KB) | ||
MV2017X0017 - GNWT - DOT - Complete Letter.pdf (370.28 KB) | ||
MV2017X0017 - GNWT - DOT - Draft Conditions.docx (74.23 KB) | ||
MV2017X0017 - GNWT - DOT - New Application - Mar23-17.pdf (12.92 MB) |
4. Permit Extension Request
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF – Extension to Term - Staff Report and Comments - May6_22.pdf (292.54 KB) | ||
GNWT-INF - Extension Request - Apr4_22.pdf (793.75 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
GNWT-INF - Dory Point - Inspection Report - August 19, 2021 - Dec14_21.pdf (580.74 KB) | ||
GNWT-INF - Dory Point - Inspection Report - September 15, 2021 - Dec14_21.pdf (4.18 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0017 - GNWT-ENR - Checkpoint - Inspector Authorization to Remove Soil within 100m Of High Water Mark - Oct 15-19.pdf (666.94 KB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0017 - GNWT - INF - Issuance Letter - Engagement Plan - Type A LUP - May15-17.pdf (287.51 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0017 - GNWT - INF - Issuance Letter - SCP - Type A LUP - May15-17.pdf (287.51 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017X0017 - GNWT - INF - Issuance Letter - WMP - Type A LUP - May15-17.pdf (287.51 KB) |