Enbridge Pipelines (NW) Inc. - MV2017P0013

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 19 of 19
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Approval Letter - Mar15-18.pdf (160.32 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Staff Report and Comments - Mar15-18.pdf (345.93 KB)
MV2017P0013 - Enbridge Pipelines - Request for comments on Revised Engagement Plan - Feb23-18.pdf (391.85 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - Feb 22_18.pdf (224.27 KB)
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - EMC Support Letter - Feb 23_18.pdf (542.59 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V.1 - Mar 23_17.pdf (10.75 MB)
Waste Management Plan
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drilling Mud Flocculent - July 19_18.pdf (570.29 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Tackifier on Shoo-Fly - July 3_18.pdf (3.51 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Sump Additive - July 10_18.pdf (289.45 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drill Cutting Solidification - June 19_18.pdf (280.99 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Waste Management Plan V1- Staff Report and Comments - May10-18.pdf (775.58 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Waste Management Plan V1-3 - Approval Letter - May10-18.pdf (291.74 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Waste Management Plan V 1.3 - April 12_18.pdf (15.37 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pieplines - Request for comments on WMP - V1-3 - Apr13-18.pdf (384.89 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan - Decision Approval Letter - Mar15-18.pdf (364.42 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan - Staff Report and Comments - Mar15-18.pdf (20.8 MB)
MV2017P0013 - Enbridge Pipelines - Request for comments on the Revised Waste Management Plan - Feb23-18.pdf (395.13 KB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan V1.2 - Feb 22_18.pdf (2.08 MB)
MV2017P0013 - Enbridge Pipelines - Waste Management Plan V1.2 - EMC Support Letter - Feb 22_18.pdf (541.18 KB)