Skip to main content

Enbridge Pipelines (NW) Inc. - MV2017P0013

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 14 of 14
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2017P0013 - Enbridge - Issuance Letter with Permit and Conditions - RFD - Feb2-18.pdf (1.25 MB)
MV2017P0013 - Enbridge - Reason for Decision - Issuance - Feb16-18.pdf (4.66 MB)
External Authorizations
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Inspectors Authorization for Extension to Spring Breakup Date - March 27_18.pdf (46.29 KB)
MV2017P0013 - Enbridge Pipelines - Inspectors Authorization for Manners Creek - March 15_18.pdf (42.22 KB)
MV2017P0013 - Enbridge Pipelines NW Inc. – Enbridge Response to ADKFN Comments – Feb 15_18.pdf (99.64 KB)
MV2017P0013 - Enbridge Pipelines NW Inc. – ADKFN Comments on Amendment to Easement – Feb 1_18.pdf (177.32 KB)
MV2017P0013 - Enbridge Pipelines - GNWT Lands Request for comments on Amendment to Easement - Jan2-18.pdf (4.76 MB)
Final Plan and Clearance
Document Received/Sent Uploaded
Enbridge – Approval - Final Plan and Clearance - Mar 8_24.pdf (174.3 KB)
Enbridge - Final Plan - Inspector Recommendation - Jan 31_24.pdf (287.77 KB)
Enbridge - Final Plan - Inspector Recommendation - Jan 17_24.pdf (165.16 KB)
MV2017P0013 - Enbridge - Final Plan - Mar 31_23.pdf (731.93 KB)
MV2017P0013 - Enbridge - Final Plan Request - Feb 17_23.pdf (196.66 KB)
Further Study Requested Sec. 22.2.b
Document Received/Sent Uploaded
MV2017P0013 - Enbridge - Review Comment Table from Applications - May 25_17.pdf (808.14 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Acknowledgement Letter for Receipt of Security Deposit - GNWT Lands - Mar15-18.pdf (147.7 KB)