Skip to main content

Enbridge Pipelines (NW) Inc. - MV2017P0013

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 23 of 23
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2017P0013 - Enbridge Pipelines - Inspection Report for June 17 2019 - GNWT Lands - Jul31-19.pdf (1.38 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - Inspection Report for February 4 2019 - GNWT Lands - Feb21-19.pdf (1.1 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 20 2018 - GNWT Lands - Oct5-18.pdf (1.34 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for October 19 2018 - GNWT Lands - Oct20-18.pdf (2.13 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for October 2 2018 - GNWT Lands - Oct20-18.pdf (1.47 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 21 2018 - GNWT Lands - Oct19-18.pdf (1.38 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for September 24 2018 - GNWT Lands - Oct18-18.pdf (1.83 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - North Site - Inspection Report for September 12 2018 - GNWT Lands - Sept14-18.pdf (2.15 MB)
MV2017P0013 - Enbridge Pipelines - July 4 Inspection Report - July 17_18.pdf (1.31 MB)
MV2017P0013 - Enbridge Pipelines - July 12 Inspection Report - July 18_18.pdf (2.05 MB)
MV2017P0013 - Enbridge Pipelines - June 5 Inspection Report - July 9_18.pdf (940.53 KB)
MV2017P0013 - Enbridge Pipelines - June 14 Inspection Report - July 17_18.pdf (1.11 MB)
MV2017P0013 - Enbridge Pipelines - June 25 Inspection Report - July 17_18.pdf (2.37 MB)
MV2017P0013 - Enbridge Pipelines - June 28 Inspection Report - July 17_18.pdf (2.07 MB)
MV2017P0013 - Enbridge Pipelines (NW) Inc - Inspection Report (Aug 10) - Sept 3, 2018.pdf (1.3 MB)
MV2017P0013 - Enbridge Pipelines (NW) Inc - Inspection Report (Aug 13) - Sept 3, 2018.pdf (1.93 MB)
MV2017P0013 - Enbridge Pipelines NW Inc - Inspection Report for May 29-30 2018 - GNWT Lands - Jun1-18.pdf (2.81 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 24 2018 - GNWT Lands - May2-18.pdf (2.11 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 4 2018 - GNWT Lands - Apr11-18.pdf (1.3 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for April 10 2018 - GNWT Lands - Apr11-18.pdf (2.19 MB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for March 28 2018 - GNWT Lands - Apr11-18.pdf (820.35 KB)
MV2013P0011 MV2017P0013- Enbridge Pipelines - Response to March 2018 inspection reports - Mar27-18.pdf (63 KB)
MV2017P0013 - Enbridge Pipelines - Inspection Report for March 21 2018 - GNWT Lands - Mar22-18.pdf (807.48 KB)