Skip to main content

Enbridge Pipelines (NW) Inc. - MV2017P0013

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Water Licence: MV2017L1-0002.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 22 of 22
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2017L1-0002 MV2017P0013 - Enbridge - Staff Report on Applications - Jan 30_18.pdf (527.35 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.3.pdf (383.88 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Update LUP and WL Application - Sept22-17.pdf (5.99 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - Pre-Hearing Conference Meeting Notes - Sept 15_17.pdf (322.16 KB)
MV2017P0013 MV2017L10002 - Enbridge Pipelines - News North Newspaper Ad - Aug 28_17.pdf (1 MB)
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.2.pdf (383.79 KB)
MV2017P0013 - Enbridge - DRAFT Permit Conditions V.2.pdf (490.79 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - External Work Plan V.1.pdf (383.84 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Review Comments on Draft Work Plan - Aug 16_17.pdf (826.17 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - DRAFT External Work Plan V.1.pdf (393.08 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Receipt for LUP and WL Application fee - C0153028 - Apr13-17.pdf (229.77 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Response to Information Request 1 - Jun7-17.pdf (136.41 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines NW Inc - Information Request 1 - Section 157-1 MVRMA - May31-17.pdf (289.47 KB)
MV2017P0013 MV2017L1-0002 - Enbridge - Participation of Board Chair in Board Decision-Making - May 15_17.pdf (429.03 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Supplemental Informatoin - Biophysical Assessment Report - Apr 4_17.pdf (14.42 MB)
MV2017L1-0002 MV2017P0013 - Enbridge Pipelines - Application - Request for Comment - Apr19-20.pd.pdf (106.97 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Supplemental Informatoin - Revised Appendix II and VII - Apr 25_17.pdf (18.64 MB)
MV2017P0013 - Enbridge Pipelines - DRAFT Estimated Security Template - Apr 21_17.pdf (571.42 KB)
MV2017P0013 - Enbridge Pipelines - DRAFT Permit Conditions - Apr 21_17.pdf (796.54 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Complete Application.pdf (329.54 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Incomplete Application - Mar 31_17.pdf (324.01 KB)
MV2017P0013 - Enbridge Pipelines - New LUP Application - Mar23-17.pdf (39.45 MB)