Skip to main content

GNWT-ECC - MV2017L8-0004

​Continue the care and maintenance and remediation and monitoring activities at the former Checkpoint Highway Maintenance Facility and the Landfarm Treatment Facility.

Accompanied by Permit MV2017X0020.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 29 of 29
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
GNWT-ECC – Checkpoint – 2022 Water Licence Annual Report - Review Comments and Reponses.pdf (109.28 KB)
GNWT-ENR - Checkpoint - Cover Letter - 2022 Annual Report - Mar8_23.pdf (274.8 KB)
GNWT-ENR - Checkpoint - 2022 Annual Report - Mar8_23.pdf (9.4 MB)
GNWT-ENR - Checkpoint - 2021 Annual Report - Acknowledgment Letter - Jun3_22.pdf (170.91 KB)
GNWT-ENR - Checkpoint - 2021 Annual Report - Cover Letter - Apr12_22.pdf (265.29 KB)
GNWT-ENR - Checkpoint - 2021 Annual Report - Apr12_22.pdf (16.16 MB)
GNWT-ENR – Checkpoint – 2020 Annual Report - Staff Report and Comments - Aug13_21.pdf (302.6 KB)
GNWT-ENR - Checkpoint - Acknowledgement - 2020 Annual Report - Aug13_21.pdf (123.38 KB)
MV2017L8-0004 - GNWT-ENR - Revised 2020 Checkpoint Annual Report - Cover Letter - Mar22-21.pdf (935.11 KB)
MV2017L8-0004 - GNWT-ENR - Conformity Table for Revised 2020 Checkpoint Annual Report - Mar22-21.pdf (134.02 KB)
MV2017L8-0004 - GNWT-ENR - Revised 2020 Checkpoint Annual Report - Mar22-21.pdf (16.8 MB)
MV2017L8-0004 - GNWT-ENR - 2020 Checkpoint Annual Repot - Feb5-21.pdf (28.48 MB)
MV2017L8-0004 - GNWT-ENR - Conformity Tables for 2020 Checkpoint Annual Report - Feb5-21.pdf (87.78 KB)
MV2017L8-0004 - GNWT-ENR - 2020 Checkpoint Annual Report Cover Letter - Fab5-21.pdf (317.32 KB)
MV2017L8-0004 - GNWT-ENR - Checkpoint - 2019 Annual Report - Staff Report - Jun16-20.pdf (202.34 KB)
MV2017L8-0004 - GNWT-ENR - Checkpoint - 2019 Annual Report - Apr24-20.pdf (14.94 MB)
MV2017L8-0004 - GNWT - ENR - Checkpoint - 2018 WL Annual Report - Feb22-19.pdf (21.95 MB)
MV2017L8-0004 - GNWT-ENR - 2017 Annual Report - Mar14-18.pdf (11.89 MB)
Designs and As-Builts
Document Received/Sent Uploaded
GNWT-ENR - Checkpoint - 2021 Annual Report - Staff Report and Comments - Jun8_22.pdf (329.02 KB)
Inspection Reports
Document Received/Sent Uploaded
MV2017L8-0004 - GNWT-ENR - Checkpoint - June 2019 Inspection Report - Feb18-20.pdf (1.18 MB)
MV2017L8-0004 - Checkpoint - GNWT Inspection report - June 12-18 - Jan17-19.pdf (378.36 KB)
Operations and Notifications
Document Received/Sent Uploaded
GNWT-ENR - Checkpoint - SNP Results and Request for Discharge - Sep8_22.pdf (1.61 MB)
GNWT-ENR - Checkpoint - SNP Results and Request for Discharge - Oct18_21.pdf (2.41 MB)
GNWT-ENR - Checkpoint - Request for Discharge - Email Correspondence - Oct18_21.pdf (245.59 KB)
GNWT-ENR - Checkpoint - Inspector’s Approval for Discharge - Oct18_21.pdf (111.57 KB)
GNWT-ENR - Checkpoint - Discharge Request Approval - Jul27_21.pdf (221.54 KB)
GNWT-ENR - Checkpoint - Request to Inspector for Decant - Jul23_22.pdf (2.07 MB)
MV2017L8-0004 - GNWT-ENR - Checkpoint - Inspector Authorization to Remove Soil within 100m Of High Water Mark - Oct 15-19.pdf (666.94 KB)
MV2017X0020 MV2017L8-0004 - GNWT-ENR - Inspector Authorization to Decant - Aug3-17.pdf (71.59 KB)