Skip to main content

Teck Metals Ltd. - MV2017L2-0007

​Discharge of effluent from the tailings pond formerly known as Pine Point, from time to time, during the open-water season. Effluent is the result of accumulation of natural precipitation in the pond. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Teck Metals - Annual Geotechnical Inspection Report - Cover Letter - Dec18_23.pdf (148.06 KB)
Teck Metals - Annual Geotechnical Inspection Report - Dec18_23.pdf (13.55 MB)
Teck Metals - 2023 Annual Geotechnical Inspection Notification - Sep25_23.pdf (208.42 KB)
Teck Metals - Letter of Submission - Pine Point 2022 Geotechnical Inspection Report - Sep 29_22.pdf (217.95 KB)
Teck Metals - 2021 Geotechnical Inspection - Cover Letter - Dec8_21.pdf (217.13 KB)
Teck Metals - 2021 Geotechnical Inspection Report - Dec8_21.pdf (42.85 MB)
MV2017L2-0007 - Teck Metals - Geotechnical Inspection Report - Dec18_20.pdf (45.26 MB)
MV2017L2-0007 - Teck Metals - Geotechnical Inspection Report - Nov8_19.pdf (34.47 MB)
MV2017L2-0007 - Teck Metals - Dam Safety Inspection Report - Nov21-18.pdf (9.13 MB)
MV2017L2-0007 - Teck Metals Ltd. - Pine Point - 2018 Annual Geotechnical Inspection Report (revised from Nov2018) -Feb25-18.pdf (10.86 MB)
MV2017L2-0007 - Teck Metals - Notice of Dyke Maintenance - Oct5-18.pdf (95.31 KB)
MV2017L2-0007 - Teck Metals Ltd - Geotechnical Inspection Report - Mar30-18.pdf (6.56 MB)