Skip to main content

Teck Metals Ltd. - MV2017L2-0007

​Discharge of effluent from the tailings pond formerly known as Pine Point, from time to time, during the open-water season. Effluent is the result of accumulation of natural precipitation in the pond. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
9. GIS Data
GIS Data
Document Received/Sent Uploaded
MV2017L2-0007 - Teck Metls - Pine Point Surface Lease.zip (6.1 KB)
MV2017L2-0007 - Teck Metsls - Pine Point Water Sampling Station.zip (7.62 KB)