Enbridge Pipelines (NW) Inc. - MV2017L1-0002

Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.

Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.

Associated Land Use Permit: MV2017P0013
Uploaded On or After
Uploaded On or Before
Displaying 1 - 24 of 24
6. Management Plans
Engagement Plan
Document Received/Sent Uploaded
MV2017L1-0002 - Enbridge Pipelines - Engagement Plan - Staff Report and Comments - Apr12-18.pdf (448.18 KB)
MV2017L1-0002 - Enbridge Pipelines - Engagement Plan V1-2 Approval Letter - Apr12-18.pdf (377.46 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Engagement Plan V1.2 - Feb 22_18.pdf (224.27 KB)
Sediment and Erosion Control
Document Received/Sent Uploaded
MV2017L1-0002 - Enbridge - SECP - Staff Report and Comments - June 20_18.pdf (771.31 KB)
MV2017L1-0002 – Enbridge Pipelines (NW) Inc. – Sediment and Erosion Control Plan V1.1 – Approval – June20_18.pdf (272.45 KB)
MV2017L1-0002 - Enbridge Pipelines - Request for comments on the Sediment and Erosion Control plan - May10-18.pdf (388.76 KB)
MV2017L1-0002 - Enbridge Pipelines - Sediment and Erosion Control plan - Apr18-18.pdf (4.47 MB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan - Staff Report and Comments - Apr12-18.pdf (412.76 KB)
MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V1 Approval Letter - Arp12-18.pdf (379.13 KB)
MV2017L1-0002 - Enbridge Pipelines - Request for comments on SCP - Mar13-18.pdf (375.61 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V.1 - Mar 23_17.pdf (10.75 MB)
Waste Management Plan
Document Received/Sent Uploaded
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drilling Mud Flocculent - July 19_18.pdf (570.29 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Tackifier on Shoo-Fly - July 3_18.pdf (3.51 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Sump Additive - July 10_18.pdf (289.45 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - MSDS - Drill Cutting Solidification - June 19_18.pdf (280.99 KB)
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Waste Management Plan V 1.3 - April 12_18.pdf (15.37 MB)
MV2017P0013 MV2017L1-0002 - Enbridge Pieplines - Request for comments on WMP - V1-3 - Apr13-18.pdf (384.89 KB)
Water Management
Document Received/Sent Uploaded
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Results Report 3 - Aug 28_18.pdf (23.88 KB)
MV2017L1-0002 - Enbridge Pipelines - Turbitity Monitoring Results Report 2 - Aug1-18.pdf (26.86 KB)
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Results Report 1 - July 3_18.pdf (134.6 KB)
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Plan - Approval Letter - May10-18.pdf (340.53 KB)
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Plan - Staff Report and Comments - May10-18.pdf (728.18 KB)
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Plan V.1 - Mar 29_18.pdf (4.72 MB)
MV2017L1-0002 - Enbridge Pipelines - Turbidity Monitoring Plan V.1 - ORS Notification - Apr 4_18.pdf (70.06 KB)