Skip to main content

Fort Smith Construction NT Ltd. - MV2016Q0036

Use of heavy equipment to quarry, stockpile abd haul gravel from existing gravel pits north of Highway #5, in the Salt Mountain Area and on the East side of the Foxhole Road. The gravel will be used for both private and public use in the fort Smith Community.​

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Fort Smith Construction - Inspection Report - May 31, 2023 - Jun12_23.pdf (3.42 MB)
Fort Smith Construction - Inspection Report - August 16, 2022 - Sep9_22.pdf (1.11 MB)
Fort Smith Construction - Inspection Report - May 27, 2022 - Jun8_22.pdf (1.83 MB)
MV2016Q0036 - Fort Smith Construction - May 20 2021 Inspection Report - Jun3-21.pdf (16.99 MB)
MV2016Q0036 - Fort Smith Construction LTD - Inspection Report for June 6 2019 - GNWT Lands - Jun7-19.pdf (797.92 KB)
Operations and Notifications
Document Received/Sent Uploaded
Fort Smith Construction - Notification - Movement Document-Manifest - Sep 28_22 (3.55 KB)
Other
Document Received/Sent Uploaded
MV2016Q0036 - Fort Smith Construction - 2019QP0034 - Final Quarry Pit Return Verification - Feb23-21.pdf (88.78 KB)