Skip to main content

Carter Industries Ltd. - MV2016L8-0007

Petroleum hydrocarbon-contaminated soil, snow and water treatment facility located in Hay River, NT. 

This License was renewed into Water License MV2022L8-0005. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 13 of 13
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
Carter Industries Ltd - Outstanding Submissions - Nov3_21.pdf (250.57 KB)
MV2016L8-0007 - Carter Industries Ltd. - 2018 and 2019 Annual Reports - Staff Report and Comments - Oct8-20.pdf (379.26 KB)
MV2016L8-0007 - Carter Industries Ltd. - Acknowledgement - 2018 2019 Annual Reports - Oct9-20.pdf (319.91 KB)
MV2016L8-0007 - Carter Industries Ltd. - 2019 Annual Report - Aug5-20.pdf (12.97 MB)
MV2016L8-0007 - Carter Industries Ltd. - 2018 Annual Report - Aug5-20.pdf (6.94 MB)
MV2016L8-0007 - Carter Industries - Request for Annual Reports and other Outstanding Plans - Apr2-19.pdf (43.38 KB)
MV2016L8-0007 - Carter Industries - Notice of 2017 Annual WL REport - Jul31-18.pdf (7.43 MB)
Designs and As-Builts
Document Received/Sent Uploaded
MV2016L8-0007 - Carter Industries Ltd. - Construction As-Built Reports - Soil and Water Treatment Facility - Apr9-20.pdf (3.94 MB)
MV2016L8-0007 - Carter Industries Ltd. - Soil and Water Treatment Facility Final Detailed Construction Design - Apr9-20.pdf (2.29 MB)
Inspection Reports
Document Received/Sent Uploaded
Carters Industry Ltd - Delayed Receipt of Sampling Results - Email Coresspondances - Nov3_21.pdf (343.1 KB)
MV2016L8-0007 - Carter Industries - Inspection Report for September 22 2017 - GNWT-ENR - Dec3-18.pdf (872.51 KB)
MV2016L8-0007 - Carter Industries - Inspection Report for June 15 2018 - GNWT-ENR - Dec3-18.pdf (1.22 MB)
MV2016L8-0007 - Carter Industries - Inspection Report for September 14 2018 - GNWT-ENR - Dec3-18.pdf (1.06 MB)